Started 10 days ago
Took 4 hr 31 min on green-dragon-02

Failed Build #15074 (Nov 10, 2019 2:12:04 AM)

Changes

Git (git http://labmaster3.local/git/llvm-project.git)

  1. [MC] Clean up MacroInstantiation. NFC (detail)

Started by timer (5 times)

This run spent:

  • 4 hr 1 min waiting;
  • 4 hr 31 min build duration;
  • 8 hr 32 min total from scheduled to completion.
Revision: d890620fb2704f0e7b0327fa6545d3d77e0fd558
  • origin/master
Revision: f296f7da2dd516d86d12a53c98642e7714015ee7
  • refs/remotes/origin/master

Identified problems

Ninja target failed

Below is a link to the first failed ninja target.
Indication 1

Missing test results

The test result file Jenkins is looking for does not exist after the build.
Indication 2

Regression test failed

This build failed because a regression test in the test suite FAILed. See the test report for details.
Indication 3