Started 26 days ago
Took 3 hr 17 min on green-dragon-05

Success Build #17735 (Sep 30, 2020 6:13:16 PM)

Changes

Git (git http://labmaster3.local/git/llvm-project.git)

  1. Revert "[PDB] Merge types in parallel when using ghashing" (detail)
  2. [mlir][Linalg] Add pattern to tile and fuse Linalg operations on buffers. (detail)
  3. [Msan] Add ptsname, ptsname_r interceptors (detail)
  4. [AMDGPU] Reorganize VOP3P encoding (detail)
  5. Re-land "[PDB] Merge types in parallel when using ghashing" (detail)
  6. [flang] Semantic analysis for FINAL subroutines (detail)
  7. [OpenMP][libomptarget] make omp_get_initial_device 5.1 compliant (detail)
  8. [OpenMP][OMPT] Update OMPT tests for newly added GOMP interface patches (detail)
  9. Handle unknown OSes in DarwinTargetInfo::getExnObjectAlignment (detail)
  10. [PowerPC] Add outer product instructions for MMA (detail)
  11. Patch IEEEFloat::isSignificandAllZeros and IEEEFloat::isSignificandAllOnes (bug 34579) (detail)
  12. [OpenMP][libarcher] Allow all possible argument separators in TSAN_OPTIONS (detail)
  13. [ARM] Add missing target for Arm neon test case. (detail)
  14. [AArch64][GlobalISel] NFC: Refactor G_FCMP selection code (detail)
  15. [lldb] Make TestGuiBasicDebug more lenient (detail)
  16. [flang] Allow record advancement in external formatted sequential READ (detail)
  17. [AArch64][GlobalISel] Add some more legal types for G_PHI, G_IMPLICIT_DEF, G_FREEZE. (detail)
  18. [WholeProgramDevirt][NewPM] Add NPM testing path to match legacy pass (detail)
  19. Try to fix build. May have used a C++ feature too new/not supported on all platforms. (detail)
  20. [lld][WebAssembly] Allow exporting of mutable globals (detail)
  21. Remove `Ops` suffix from dialect library names (detail)
  22. [flang] Fix Gw.d format output (detail)
  23. [mlir] Split Dialect::addOperations into two functions (detail)
  24. [AArch64][GlobalISel] Clamp oversize FP arithmetic vectors. (detail)

Started by timer (3 times)

This run spent:

  • 2 hr 30 min waiting;
  • 3 hr 17 min build duration;
  • 5 hr 48 min total from scheduled to completion.
Revision: 196c097bba8b0b3932f3fcdcd5310f78ebaa43a3
  • origin/master
Revision: c2cc01b14ef84bee845318bde3ae623091934b96
  • refs/remotes/origin/master
Test Result (no failures)