collapse
0%
WDescription%
Build stability: All recent builds failed.0
Test Result: 0 tests failing out of a total of 32,019 tests.100
Build History
x
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 Identified problems
 
 Identified problems
 Identified problems
 Identified problems
 
 
 
 
 
 Identified problems

Project Clang Stage 2: cmake, R -g Asan&UBSan, using Stage 1 RA, Phase 1

Project name: clang-stage2-cmake-RgSan
Phase 1 bot.
LLVM/Clang Warnings Trend
Enlarge Configure
Test Result Trend
[Test result trend chart]
(just show failures) enlarge
Workspace
Recent Changes

Identified problems

Regression test failed

This build failed because a regression test in the test suite FAILed. See the test report for details.
Indication 1

Ninja target failed

Below is a link to the first failed ninja target.
Indication 2

Latest Test Result (no failures)

Upstream Projects