Started 2 mo 7 days ago
Took 5 hr 44 min

Unstable Build #1638 (May 31, 2020 2:50:00 AM)

Changes
  1. Revert "[NFC][PowerPC] Add a new case to test phi-node-elimination pass" (details)
  2. [ScheduleDAG] Avoid unnecessary recomputation of topological order. (details)
  3. [X86][AVX] Pad small shuffle inputs in combineX86ShufflesRecursively (details)
  4. [X86][AVX] getFauxShuffleMask - don't widen shuffle inputs from INSERT_SUBVECTOR(X,SHUFFLE(Y,Z)) (details)

Started by upstream project LLDB Incremental build number 19980
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 19981
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 19982
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 19983
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 19984
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 19985
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 19986
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 19987
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 19988
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 19989
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 19990
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 19991
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 19992
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 19993
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 19994
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 19995
originally caused by:

  • Started by timer

This run spent:

  • 7 hr 50 min waiting;
  • 5 hr 44 min build duration;
  • 10 hr total from scheduled to completion.
Revision: 32a881a12e43a709ffa19d161f6559cc58e94abe
  • refs/remotes/origin/master
Revision: d33ba1aa0b505e3f4c55b382f171e8cbef6a1843
  • refs/remotes/origin/master
Revision: 32a881a12e43a709ffa19d161f6559cc58e94abe
  • refs/remotes/origin/master
Test Result (1 failure / +1)
Revision: 6a075b6de4cafebec9ca1ff9eec7229a617c93f6
  • llvmorg-5.0.2
Revision: d0d8eb2e5415b8be29343e3c17a18e49e67b5551
  • llvmorg-7.0.1
Revision: 0399d5a9682b3cef71c653373e38890c63c4c365
  • llvmorg-9.0.0

Identified problems

Ninja target failed

Below is a link to the first failed ninja target.
Indication 1

Regression test failed

This build failed because a regression test in the test suite FAILed. See the test report for details.
Indication 2

Compile Error

This build failed because of a compile error. Below is a list of all errors in the build log:
Indication 3