Started 1 mo 10 days ago
Took 5 hr 42 min

Aborted Build #2051 (Oct 24, 2020 8:24:56 PM)

Changes
  1. For P0732R2, P1907R1: ensure that template parameter objects don't refer (details)

Started by upstream project LLDB Incremental build number 24570
originally caused by:

  • Started by timer
  • Started by timer
  • Started by timer
  • Started by timer
  • Started by timer
  • Started by timer
  • Started by timer
  • Started by timer
  • Started by timer
  • Started by timer
  • Started by timer
  • Started by timer
  • Started by timer

This run spent:

  • 2 hr 36 min waiting;
  • 5 hr 42 min build duration;
  • 5 hr 51 min total from scheduled to completion.
Revision: e8ba87e92b857c14b7eb5466c4266a9e09a1f5fb
  • refs/remotes/origin/master
Revision: 7b3515880c22c887cd5ca4825dfb060ad82d3ebc
  • refs/remotes/origin/master
Revision: e8ba87e92b857c14b7eb5466c4266a9e09a1f5fb
  • refs/remotes/origin/master
Test Result (no failures)
    Revision: 6a075b6de4cafebec9ca1ff9eec7229a617c93f6
    • llvmorg-5.0.2
    Revision: d0d8eb2e5415b8be29343e3c17a18e49e67b5551
    • llvmorg-7.0.1

    Timeout has been exceeded

    Identified problems

    Ninja target failed

    Below is a link to the first failed ninja target.
    Indication 1

    Regression test failed

    This build failed because a regression test in the test suite FAILed. See the test report for details.
    Indication 2