Started 13 days ago
Took 6 hr 38 min

Failed Build #1398 (May 17, 2020 7:26:09 AM)

Changes
  1. [LoopUnroll] Precommit test for PR459393. (details)
  2. [LoopUnroll] Extend test case with additional loop with larger TC. (details)
  3. [InstCombine] improve analysis of FP->int->FP to eliminate fpextend (details)
  4. [X86] getTargetConstantBitsFromNode - remove unnecessary X86ISD::VBROADCAST handling. (details)
  5. [X86] Add getTargetConstantFromBasePtr helper. NFC. (details)
  6. [mlir] NFC - VectorTransforms use OpBuilder where relevant (details)
  7. [AVR] Explicitly set the address of the data section when invoking the linker (details)
  8. [ObjectYAML][DWARF] Take into account other debug sections in DWARFYAML::Data::isEmpty(). (details)
  9. [InstCombine] add tests for FP cast of cast; NFC (details)
  10. [x86] favor vector constant load to avoid GPR to XMM transfer (details)
  11. [XRay] Migrate xray_naive_log=true tests to xray_mode=xray-basic (details)
  12. ImmutableGraph.h - remove unused raw_ostream.h include. NFC (details)
  13. GlobPattern.h - remove unnecessary BitVector.h/StringRef.h includes. NFC (details)
  14. Revert rGca18ce1a00cd8b7cb7ce0e130440f5ae1ffe86ee "GlobPattern.h - remove unnecessary BitVector.h/StringRef.h includes. NFC" (details)

Started by upstream project LLDB Incremental build number 18525
originally caused by:

  • Started by timer
  • Started by timer

Started by upstream project LLDB Incremental build number 18526
originally caused by:

  • Started by timer
  • Started by timer
  • Started by timer
  • Started by timer

Started by upstream project LLDB Incremental build number 18527
originally caused by:

  • Started by timer
  • Started by timer
  • Started by timer
  • Started by timer
  • Started by timer

Started by upstream project LLDB Incremental build number 18528
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 18529
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 18530
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 18531
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 18532
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 18533
originally caused by:

  • Started by timer
  • Started by timer
  • Started by timer
  • Started by timer
  • Started by timer

Started by upstream project LLDB Incremental build number 18534
originally caused by:

  • Started by timer

Started by upstream project LLDB Incremental build number 18535
originally caused by:

  • Started by timer
  • Started by timer

This run spent:

  • 3 hr 12 min waiting;
  • 6 hr 38 min build duration;
  • 9 hr 51 min total from scheduled to completion.
Revision: a8163553201ffc3560b4f4b259d7cc9c31ec236b
  • refs/remotes/origin/master
Revision: 090cf4591fbac2fd8445080953bf0eadaa9c7f46
  • refs/remotes/origin/master
Revision: a8163553201ffc3560b4f4b259d7cc9c31ec236b
  • refs/remotes/origin/master
Test Result (4 failures / +1)Show all failed tests >>>

Identified problems

Ninja target failed

Below is a link to the first failed ninja target.
Indication 1

Regression test failed

This build failed because a regression test in the test suite FAILed. See the test report for details.
Indication 2