Started 24 days ago
Took 45 min

Failed Build #2812 (Oct 21, 2019 3:45:08 AM)

Changes
  1. [obj2yaml] - Stop triggering UB when dumping corrupted strings. (detail)
  2. [obj2yaml] - Fix a comment. NFC. (detail)
  3. Fix llvm signal tests build. (detail)

Started by an SCM change

This run spent:

  • 9 sec waiting;
  • 45 min build duration;
  • 45 min total from scheduled to completion.
Revision: 7774c4da0ada8aad6524d2e5722c0014fedfd6c0
  • refs/remotes/origin/master
Revision: a48633b5bbbbe9e20a7199eaed651ff6024d7967
  • refs/remotes/origin/master
Revision: 7774c4da0ada8aad6524d2e5722c0014fedfd6c0
  • refs/remotes/origin/master
Test Result (1 failure / +1)

Identified problems

Ninja target failed

Below is a link to the first failed ninja target.
Indication 1

Regression test failed

This build failed because a regression test in the test suite FAILed. See the test report for details.
Indication 2