SuccessConsole Output

Started by upstream project "clang-stage1-RA" build number 15104
originally caused by:
 Started by an SCM change
 Started by an SCM change
Started by upstream project "clang-stage1-RA" build number 15105
originally caused by:
 Started by an SCM change
Started by upstream project "clang-stage1-RA" build number 15106
originally caused by:
 Started by an SCM change
 Started by an SCM change
Started by upstream project "clang-stage1-RA" build number 15107
originally caused by:
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
Started by upstream project "clang-stage1-RA" build number 15108
originally caused by:
 Started by an SCM change
 Started by an SCM change
Running as SYSTEM
Building remotely on labmaster2 (Zorg) in workspace /Users/buildslave/jenkins/workspace/clang-stage2-Rthinlto_relay@2
[clang-stage2-Rthinlto_relay@2] $ /bin/sh -xe /var/folders/q0/p3jrdx7n2s74x5bnw_pkhqr80000gn/T/jenkins8550641667069118606.sh
+ rm -rf last_good_build.properties
+ curl -fvkO http://labmaster2.local/artifacts/clang-stage1-RA/last_good_build.properties
* Hostname was NOT found in DNS cache
  % Total    % Received % Xferd  Average Speed   Time    Time     Time  Current
                                 Dload  Upload   Total   Spent    Left  Speed

  0     0    0     0    0     0      0      0 --:--:-- --:--:-- --:--:--     0
  0     0    0     0    0     0      0      0 --:--:--  0:00:01 --:--:--     0
  0     0    0     0    0     0      0      0 --:--:--  0:00:02 --:--:--     0
  0     0    0     0    0     0      0      0 --:--:--  0:00:03 --:--:--     0*   Trying 10.1.1.12...

  0     0    0     0    0     0      0      0 --:--:--  0:00:04 --:--:--     0* Connected to labmaster2.local (10.1.1.12) port 80 (#0)
> GET /artifacts/clang-stage1-RA/last_good_build.properties HTTP/1.1
> User-Agent: curl/7.37.1
> Host: labmaster2.local
> Accept: */*
> 
< HTTP/1.1 200 OK
* Server nginx/1.12.2 is not blacklisted
< Server: nginx/1.12.2
< Date: Sun, 04 Oct 2020 15:44:47 GMT
< Content-Type: application/octet-stream
< Content-Length: 123
< Last-Modified: Sun, 04 Oct 2020 15:39:02 GMT
< Connection: keep-alive
< ETag: "5f79ec96-7b"
< Accept-Ranges: bytes
< 
{ [data not shown]

100   123  100   123    0     0     27      0  0:00:04  0:00:04 --:--:--    27
* Connection #0 to host labmaster2.local left intact
+ cat last_good_build.properties
LLVM_REV=
GIT_DISTANCE=368041
GIT_SHA=2c48dd7c3ac
ARTIFACT=clang-stage1-RA/clang-d368041-g2c48dd7c3ac-t15109-b15109.tar.gz
+ grep '^GIT_SHA\|^ARTIFACT' last_good_build.properties
+ cat trigger.properties
GIT_SHA=2c48dd7c3ac
ARTIFACT=clang-stage1-RA/clang-d368041-g2c48dd7c3ac-t15109-b15109.tar.gz
Waiting for the completion of Clang Stage 2: cmake, RThinLTO, using Stage 1 RA
Clang Stage 2: cmake, RThinLTO, using Stage 1 RA #3619 started.
Clang Stage 2: cmake, RThinLTO, using Stage 1 RA #3619 completed. Result was SUCCESS
Build step 'Trigger/call builds on other projects' changed build result to SUCCESS
Finished: SUCCESS