Started 2 hr 33 min ago
Took 1 hr 30 min on green-dragon-05

Failed Build #17250 (Aug 8, 2020 1:42:57 AM)

No changes.

Started by timer

This run spent:

  • 1 ms waiting;
  • 1 hr 30 min build duration;
  • 1 hr 30 min total from scheduled to completion.
Revision: 0b90a08f7722980f6074c6eada8022242408cdb4
  • origin/master
Revision: 74e099cb9569f67ddb4341839eea408abc67e04e
  • refs/remotes/origin/master
Test Result (4 failures / ±0)Show all failed tests >>>

Identified problems

Ninja target failed

Below is a link to the first failed ninja target.
Indication 1

Regression test failed

This build failed because a regression test in the test suite FAILed. See the test report for details.
Indication 2

Compile Error

This build failed because of a compile error. Below is a list of all errors in the build log:
Indication 3