Started 3 hr 2 min ago
Took 26 min on master

Failed Build #780 std= exceptions= (Aug 12, 2020 9:05:12 AM)

No changes.

Started by an SCM change

This run spent:

  • 14 sec waiting;
  • 26 min build duration;
  • 26 min total from scheduled to completion.
Revision: 8d4860aa9ee78f4c948b5f38a043c527d49d6a34 from SCM: <local-green-dragon-mirror>/llvm-project
  • refs/remotes/origin/master

Identified problems

Matrix build libc++ and libc++abi trunk » ON,c++17,green-dragon-07 #780 std=c++17 exceptions=ON

Ninja target failed

Below is a link to the first failed ninja target.
Indication 1

Compile Error

This build failed because of a compile error. Below is a list of all errors in the build log:
Indication 2

Regression test failed

This build failed because a regression test in the test suite FAILed. See the test report for details.
Indication 3

Identified problems

Matrix build libc++ and libc++abi trunk » ON,c++17,green-dragon-07 #780 std=c++17 exceptions=ON

Ninja target failed

Below is a link to the first failed ninja target.
Indication 1

Compile Error

This build failed because of a compile error. Below is a list of all errors in the build log:
Indication 2

Regression test failed

This build failed because a regression test in the test suite FAILed. See the test report for details.
Indication 3

Configuration MatrixONOFF
c++03
Success
Success
c++11
Success
Success
c++14
Success
Success
c++17
Failed
Success
c++2a
Success
Success