Started 26 days ago
Took 50 min

Success Build clang-d332016-g08390c52a29-t3873-b3873.tar.gz (Nov 17, 2019 4:05:39 AM)

Issues

No known issues detected

Build Log

Changes
  1. [InstCombine] Add extra tests for overflow_to_sat.ll. NFC (detail)
  2. [InstCombine] Canonicalize sadd.with.overflow with clamp to sadd.sat (detail)
  3. [InstCombine] Canonicalize ssub.with.overflow with clamp to ssub.sat (detail)

Started by upstream project relay-test-suite-verify-machineinstrs build number 6717
originally caused by:

This run spent:

  • 35 min waiting;
  • 50 min build duration;
  • 50 min total from scheduled to completion.
Revision: 08390c52a2902502cd9b25472aa4c6380230c18e
  • detached