Console Output

Started by upstream project "clang-stage1-RA" build number 22804
originally caused by:
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
Started by upstream project "clang-stage1-RA" build number 22805
originally caused by:
 Started by an SCM change
Started by upstream project "clang-stage1-RA" build number 22806
originally caused by:
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
 Started by an SCM change
Running as SYSTEM
Building on master in workspace /Users/Shared/Jenkins/Home/workspace/clang-stage2-cmake-RgSan_relay
[clang-stage2-cmake-RgSan_relay] $ /bin/sh -xe /Users/Shared/Jenkins/tmp/jenkins4380364414338865117.sh
+ rm -rf last_good_build.properties
+ curl -fvkO http://labmaster2.local/artifacts/clang-stage1-RA/last_good_build.properties
  % Total    % Received % Xferd  Average Speed   Time    Time     Time  Current
                                 Dload  Upload   Total   Spent    Left  Speed

  0     0    0     0    0     0      0      0 --:--:-- --:--:-- --:--:--     0
  0     0    0     0    0     0      0      0 --:--:-- --:--:-- --:--:--     0
  0     0    0     0    0     0      0      0 --:--:--  0:00:01 --:--:--     0*   Trying 10.1.1.12...
* TCP_NODELAY set

  0     0    0     0    0     0      0      0 --:--:--  0:00:02 --:--:--     0* Connected to labmaster2.local (10.1.1.12) port 80 (#0)
> GET /artifacts/clang-stage1-RA/last_good_build.properties HTTP/1.1
> Host: labmaster2.local
> User-Agent: curl/7.64.1
> Accept: */*
> 
< HTTP/1.1 200 OK
< Server: nginx/1.19.1
< Date: Wed, 28 Jul 2021 09:39:57 GMT
< Content-Type: application/octet-stream
< Content-Length: 125
< Last-Modified: Wed, 28 Jul 2021 08:46:24 GMT
< Connection: keep-alive
< ETag: "61011960-7d"
< Accept-Ranges: bytes
< 
{ [125 bytes data]

100   125  100   125    0     0     41      0  0:00:03  0:00:02  0:00:01    41
* Connection #0 to host labmaster2.local left intact
* Closing connection 0
Waiting for the completion of Clang Stage 2: cmake, R -g Asan&UBSan, using Stage 1 RA, Phase 1
Clang Stage 2: cmake, R -g Asan&UBSan, using Stage 1 RA, Phase 1 #7988 started.
Clang Stage 2: cmake, R -g Asan&UBSan, using Stage 1 RA, Phase 1 #7988 completed. Result was FAILURE
Build step 'Trigger/call builds on other projects' changed build result to SUCCESS
Finished: SUCCESS